Projects
Here is a partial list of current and recent projects I am or was involved
in.
openETCS
Open Proofs Methodology for the European Train
Control Onboard System
The project is concerned with the realisation of a new approach to
develop the software of safety-critical rail systems. On the example
of the software of the onboard unit of the European Train Control
System (ETCS), is studies how and with what means an open source
solution can be provided. The software shall be developed with free,
open tools, and a community shall be set up which completes and
further maintains the software. The role of the DLR concerns mainly
the aspect of verification and validation.
Funding: openETCS is supported in the ITEA 2 programme.
Duration: July 2012 - June 2015
More information: openETCS home page
NGRS-II
Next Generation Railway Systems - TP 1000: Adequate Technology
NGRS-II is a basic research project
addressing future concepts and technologies for the rail sector. I am
directing the sub-project "Adequate Technology, which works on extending
and integrating laboritories for rail test and simulation. Personally,
I contribute to the application of model-based testing technologies to
rail signalling components.
Funding: NGRS-II is funded by the Helmholtz Society.
Duration: January 2012 - December 2015
NeGSt
Neue Generation Signaltechnik (New Generation Signalling Technics)
One of the goals of NeGSt is a redesign of the standard user interface
of electronic interlocking systems. I am involved in developing a test
concept for checking conformance of implementations with the standard.
Funding: NeGSt is funded by the Federal Ministry for Economy.
Duration: January 2012 - August 2013
More information:
NeGSt home page
|